Inside WD’s flooded Thai Factory
ภายในโรงงาน WD ไทย ที่ถูกน้ำท่วม

Impact of the flooding of the WD factory – Forbes, October 28, 2011
…It turns out that Bang Pa in facility was submerged with 2 meters of water. This is the old Read- Write facility and I have been in it many times. The first floor is where most of the slider processing equipment was located. Most of the equipment was lost to the flood. They last saws, grinders, sorters, cleaners, steppers, alignment tool etc. It’s a real mess. This situation for WD is pretty bad because they had all their slider fabrication in one basket. It will take at least 4 months to start the recovery and a year to get back to where they were pre-flood. It looks like the high water will not recede for at least 3 weeks…

Inside WD’s flooded Thai Factory – channelregister.co.uk, October 27, 2011

This entry was posted in Floods. Bookmark the permalink.

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.