Thread: Jakarta Airport Line

  1. #16
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,804
    Commuter line airport train to operate in 2013, The Jakarta Post, 29.03/12
    The government is speeding up the construction of a double track railway connecting Jakarta and Soekarno-Hatta International Airport to cope with severe congestion on main roads to the airport.

    Deputy Transportation Minister Bambang Susantono said the airport railway project would also utilize existing commuter line tracks and would commence operations in the middle of 2013. “We need this commuter line airport train not only to reduce highway congestion but also to support the Manggarai–Soekarno Hatta express train that is currently being studied by the state infrastructure financing company PT Sarana Multi Infrastruktur,” he told The Jakarta Post in Jakarta on Monday.

    The airport commuter line will pass through Manggarai–Sudirman–Tanah Abang–Duri–Grogol–Bojong Indah–Kalideres–Tanah Tinggi–Soekarno Hatta. The state railway operator PT KAI will add 7-kilometer long double tracks connecting Tanah Tinggi to the airport that requires a Rp 2.25 trillion (US $245.25 million) investment.

    He said that PT KAI was currently studying the entry point in Soekarno-Hatta International Airport for the commuter line airport train. “PT KAI is going to finish the study next month,” he added. He said that the railway company had two options for an entry point: Either the train entered behind the airport through its M1 gate or it ran side by side with the Jakarta Outer Ring Road corridor before entering the airport. By using the commuter line tracks, he said that airline passengers’ journey time would be 45 minutes to the airport from the center of the capital.

    In addition, he said that the 33 -kilometer railway project to the airport from Manggarai station would be offered for tender process in 2013. “The feasibility study is going to be finished by the end of this year and construction should be started in 2014,” he said. On this track, travelers will spend only a 35 minute journey to Soekarno-Hatta International Airport with an express train. The project has been abandoned since 2005 due to a combination of problems ranging from land acquisition to financing.

    The project may require a Rp 10.2 trillion investment, far higher than the Rp 4.6 trillion estimated in 2007. The figure swelled from the original estimate due to several changes, including the construction of a double track line instead of a single track that was to overlap with the existing railway line, and the possible construction of shopping malls to cater for passengers.

    Passenger traffic through the country’s main airport currently stands at 51.1 million per year, while its maximum capacity was only 22 million.

    Meanwhile, PT KAI is currently constructing a 28-kilometer double track railway in North Sumatra, linking the heart of Medan to the Kuala Namu International Airport in the Deli Serdang region. “Travelers from Medan will arrive in Kuala Namu Airport within 30 minutes,” he said. Kuala Namu Airport, which has a total capacity of 9 million passengers, is expected to commence operations in 2013, he said. (nfo)

  2. #17
    Join Date
    Aug 2003
    Posts
    12,072
    Airport line - the new line within JABOTABEK commuter networks?

  3. #18
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,804
    Quote Originally Posted by Wisarut View Post
    Airport line - the new line within JABOTABEK commuter networks?
    Yes, the plan is to run a spur line off the Tangerang line (which will need to be completely duplicated and have an express line built) north 7km to the airport. Seems the most cost feasible and sensible option than building a whole new line which knowing Jakarta would take decades. One of the problems is that the Tangerang line has numerous level crossings and discipline & adherence by drivers in Jakarta regarding stopping at level crossing is very low. So they'll need to reduce the number of crossing otherwise the Airport Express will encounter some obstacles.....!