    A friend of mine came up on the train from the south and said this works is quite impressive. Sadly he had no camera.

    The Enforcer!

  2. #167
    Join Date
    Aug 2003
    Posts
    11,800
    The flood is goign to delay Red lien commuter project - nto meet the deadline of Jan 2012 for sure

    Quote Originally Posted by karncc
    ภาพครับ โครงการคงต้องหยุดชะงักชั่วคราว และอาจจะเสร็จไม่ทันวันสิ้นสุดสัญญาเดือนมกราคม 2555





  3. #168
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    Quote Originally Posted by Wisarut View Post
    The flood is goign to delay Red lien commuter project - nto meet the deadline of Jan 2012 for sure
    Which is good for the SRT & the contractor has they had not a snow flakes chance in Bkk of meeting the original deadline of Jan 2012. Even without the flooding, early 2013 looked accurate leaving aside the issues of no Bang Sue station and electrification uncertainty.

    The increased delays due to the floods may actually be a blessing for this line as it may get gauge change and electrification decided upon before the line opens than sometime later.....

  4. #169
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    Unsurprisingly all work halted on the red line. For those areas not affected directly by flooding the main problem is the combination of an inability to source materials (sand, cement etc) and workers being affected by flooding.

    The SRT stated on 2 November that work at the end of September was at 83% completion, http://www.railway.co.th/resultproje...edline=5409201

  5. #170
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    SRT accused of negligence, BKK Post 14/02/2012
    A company contracted to build the Bang Sue-Taling Chan elevated railway line on Tuesday filed a petition with the Department of Special Investigation asking it to probe the role of the State Railway of Thailand for allegedly preventing it from working.

    Sooksan Nuntakul, a representative for Chun Wo Construction & Engineering, submitted a letter to DSI chief Tharit Pengdit accusing the SRT of refusing to investigate the company's joint venture partner, Unique Engineering and Construction Plc, for allegedly violating their partnership agreement.

    Chun Wo and Unique were awarded an 8.7 billion-baht contract by the SRT for the civil engineering work on the 15-km mass transit line under the name ``Unique-Chun Wo Joint Venture" in 2008. The company was supposed to take charge of the project's railway systems engineering. However, after the joint venture signed a contract with the SRT, Unique gave authority to A.S. Associated Engineering (1964) Co to do the work instead.

    Chun Wo lodged complaints with Supoj Saplom, the then-permanent secretary for transport, several times but received no response. It said the SRT refrained from performing its official duty by letting a third party outside the contract oversee the project and that it may cause loss and damage. The DSI will look into the company's complaint, Mr Tharit said.

  6. #171
    Join Date
    Aug 2003
    Posts
    11,800
    SRT is going to run the red line commuter from Bang Son to Talingchan as the test run for a month until the ramp to connect the elevated track and existing track is done.

    After the ramp is done, the terminal for outbound train to Talingchan will be at Bangsue 2 while the inbound train from Talingchan will stop at Bangsue 1 which is just 200 meter South of Bangsue 2.

    This train will run at 20 minute interval with 2 sets of Sprinter DMUs

    Nevertheless, I think this DMU should also run to either Thonburi or Salaya in complement with Siriraj (Thonburi) - Salaya shuttle trains ... but the greatest wish of all is the massive electrification to Thonburi and Salaya - after the red line commuter has been fully electrified - and may need to have the new power plants to ensure that their will be no brownout while running the EMUs.

  7. #172
    Join Date
    Jun 2004
    Location
    Sathorn, Bangkok
    Posts
    1,816
    Quote Originally Posted by Wisarut View Post
    Bangsue 1 which is just 200 meter South of Bangsue 2.
    We have two Bangsue stations?

    The Enforcer!

  8. #173
    Join Date
    Aug 2003
    Posts
    11,800
    ^^^
    Indeed we have Bangsue 2 since 1989 ...

  9. #174
    Join Date
    Jun 2004
    Location
    Sathorn, Bangkok
    Posts
    1,816
    Quote Originally Posted by Wisarut View Post
    ^^^
    Indeed we have Bangsue 2 since 1989 ...
    Okay, missed this. Are they co-sited or different ends of the same platform run?

    The Enforcer!

  10. #175
    Join Date
    Aug 2003
    Posts
    11,800
    Bangsue 2 is on the different platform - about 400 meter from Bangsue 1 which is central platform

  11. #176
    Join Date
    Jun 2004
    Location
    Sathorn, Bangkok
    Posts
    1,816
    Quote Originally Posted by Wisarut View Post
    Bangsue 2 is on the different platform - about 400 meter from Bangsue 1 which is central platform
    Thanks, Khun Wisarut,

    Is there a track layout plan showing this?

    The Enforcer!

  12. #177
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    Over on SSC Khun Marut has posted a number of pics of the almost completed new Talking Chan station:

    Quote Originally Posted by marut View Post
    สถานีชุมทางตลิ่งชัน


    ชานชาลาสถานี มองจากมุมไกลครับ


    บริเวณลานจอดรถด้านหลังสถานี มีการจำลองอาคารสถานีหลังเก่ามาไว้ด้วย โดยวัสดุบางอย่างก็นำมาจากอาคารเดิมที่รื้อถอนออกไปน ั่นเอง






    อาคารหลังใหม่







  13. #178
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    ภายในอาคารไม่ซับซ้อนมากครับ เดินเข้ามา ซ้ายมือจะเป็นช่องขายตั๋ว และทางเข้าสู่ชานชาลา




    เดินตรงเข้ามา ขวามือก็จะเป็นบันไดเลื่อนลงไปทางลอด


    ส่วนซ้ายมือจะเป็นบันไดธรรมดาครับ


    ในทางลอด


    วิวบนชานชาลา


    รางวิ่งผ่าน






    หมดแล้วครับ ขอบคุณสำหรับคำติชมนะครับ ไว้เจอกันคราวหน้าครับ
    Available at http://www.skyscrapercity.com/showth...882032&page=86

  14. #179
    Join Date
    Jan 2005
    Location
    Bangkok & Melbourne
    Posts
    2,755
    I had been of the understanding that the whole of the Red Line is being built to allow for gauge conversion at a later date. However, this section of line on a low viaduct shows that it has not been built to allow for easy conversion to standard gauge.

    Quote Originally Posted by micro112 View Post
    28/05/2555 จากจุดตัดเดิมชัยพฤกษ์


    ช่วงทางยกระดับ ไม่มีหินโรยทาง ต่างจากช่วงระดับดินที่มีหินโรย


    มุ่งไปทางสถานีชุมทางตลิ่งชัน ฝั่งทิศใต้เผื่อพื้นที่ไว้มากเลยครับ

  15. #180
    Join Date
    Aug 2003
    Posts
    11,800
    For the matter relating to the High Speed down South, I don't think that they will have to reguage that double track section for red lien commuter - since the HARD lesson from the flood of 2011 dictate that the high speed down South must be elevated at 7-12 meter high from the ground